Starting in January, you’ll see some changes to your utility bill. Over the past two years, the City Council has reviewed the utility rate structure, project costs, and anticipated needs. As a result, they’ve updated the water and wastewater master plans, revised the system development charges (SDCs) for new construction, and adjusted how utility bills are calculated.
The biggest change is making rates more responsive to how much water is used. Right now, the monthly residential flat charge includes 400 cf (about 3,000 gallons) of water, meaning you pay the same flat rate amount whether you use 1,000 or 3,000 gallons. The new rate will lower the flat rate and no longer include the 400 cf allowance, so you’ll only pay for what you use. This benefits households with lower water usage and was designed to be revenue-neutral for the City.
Another change involves adding a consumption-based charge for sewer use instead of a flat fee. Currently, single-family residential sewer users pay a flat fee regardless of usage, while other users like multi-family and commercial are charged based on water consumption. Since summer water use often doesn’t affect the sewer system (like water for pools or irrigation), the new rate structure will use a winter average to calculate sewer charges in the summer for residential users. From April to September, sewer charges will be based on the lesser of your actual usage or the average usage from October to March (winter average).
Lastly, the rates for water, sewer, and the street/storm fee were adjusted for inflation using the Consumer Price Index (CPI). Water and the street/storm fee were adjusted by 3.1%. Since there is a need to replace the City’s main sewer line to the Gresham treatment plant, the sewer rate was increased by 7.1% (3.1% for inflation, and 4% to help cover the cost of the project). This replacement, identified in the master plan, has been under study by an engineering firm monitoring the flow through the current 15-inch line to ensure accurate data for the new line’s sizing and future construction.
More details about all the changes are provided in the tabs below. Please feel free to reach out to the City online, by phone or in person if you have any questions or concerns.