The City of Wood Village is committed to maintaining and improving streets, utilities, and public infrastructure to support a safe, connected, and thriving community.
As we complete construction projects throughout the city, we appreciate your patience and cooperation. Please slow down in work zones, watch for crews and equipment, follow posted traffic control signs, and allow extra travel time for delays.
General construction hours are typically 7 a.m. to 6 p.m., Monday through Friday, though schedules may vary by project. Weather conditions, contractor availability, and field conditions may affect construction timelines and work hours.
Project pages provide the latest information on active construction projects, anticipated impacts, and project schedules. For questions about a specific project, please contact the Wood Village Public Works Department.
Becky Gallien
Public Works Projects Manager
Active Projects
The City of Wood Village is rehabilitating NE 236th Avenue between Shannon Street and Shamrock Drive to improve roadway conditions, extend pavement life, and enhance stormwater management. The project is part of the City’s ongoing investment in maintaining and improving public infrastructure.
Work includes:
- Full roadway rehabilitation on NE 236th Avenue between Shannon Street and Shamrock Drive.
- Pavement reconstruction and resurfacing.
- Stormwater system improvements designed by RH2 Engineering.
- Installation of three new catch basins.
- Replacement of one existing catch basin.
Project Details
General work hours: 7 a.m. to 6 p.m., Monday through Friday.
Location: From the intersection of Holladay Place, Shamrock Drive, and NE 236th Avenue to the intersection of Shannon Street and NE 236th Avenue.
Start date: August 17, 2026
Anticipated completion date: September 2026
Construction Schedule
August 27 | Paving on west side
September 11 | Paving on east side
Traffic Impacts
During construction, community members should expect:
- Temporary lane restrictions.
- Traffic control measures throughout the project area.
- Construction equipment entering and exiting the roadway.
- Possible travel delays.
August 27 and September 11 Access Restrictions
- No vehicle access on treated section until pavement has cured.
- Community members should move vehicles outside the project area before work begins if they need access during the day.
- Homes in this area should place their waste bins outside the work zone before 6 a.m. to ensure pickup.
Community members are encouraged to avoid the area when possible and follow all posted traffic control signs and directions from work crews.
Parking Information
To help minimize disruptions, the City Hall parking lot will be available for community members to use during construction hours.
Vehicles left on project streets during posted construction hours may be subject to towing. Vehicles removed from the work area will be relocated to Wood Village City Hall, where owners may retrieve them.
The City of Wood Village is completing pavement preservation work on Village Court, Riverwood Street, and NE 240th Place to extend pavement life, improve roadway conditions, and reduce the need for more costly repairs in the future. The project is part of the City’s ongoing investment in maintaining local streets and public infrastructure.
Work includes:
- Asphalt patching on Village Court and Riverwood Street.
- Crack sealing and curb-line sealing.
- Slurry seal application.
- Street cleaning and pavement preservation treatments designed to protect existing roadways and extend their service life.
Project Details
General work hours: 7 a.m. to 6 p.m., Monday through Friday
Location: Village Court, Riverwood Street, and NE 240th Place
Start date: TBD
Anticipated completion date: TBD, weather permitting
Construction Schedule
Updated 9/4/26: Due to weather, the roadwork originally scheduled for September 3-8 has been postponed. The revised construction schedule can be found below.
September 10-11 | Road patching on Village Ct and Riverwood S
September 11 | Crack and curb-line sealing on Village Ct, Riverwood St, and NE 240th Pl
September 14 | Slurry seal application on Village Ct, Riverwood St, and NE 240th Pl
Traffic Impacts
During construction, community members should expect:
- Temporary traffic restrictions and delays.
- Construction crews and equipment operating in the roadway.
- No street parking from 7 a.m. to 6 p.m. on all work days.
- Temporary access restrictions during paving and sealing operations.
- On 9/10, expect an overnight lane closure on Riverwood St
September 14 Access Restrictions
- No vehicle access on treated streets until the slurry seal has cured.
- No through traffic or local traffic will be permitted during the closure period.
- Community members should move vehicles outside the project area before work begins if they need access during the day.
Parking Information
To help minimize disruptions, the City Hall parking lot will be available for community members to use during construction hours.
Vehicles left on project streets during posted construction hours may be subject to towing. Vehicles removed from the work area will be relocated to Wood Village City Hall, where owners may retrieve them.
The City of Wood Village Public Works Department is sealing sewer manholes throughout the City to reduce inflow and infiltration (I&I) within the wastewater system, improve system efficiency, and extend the life of existing infrastructure. This work is part of the City’s ongoing investment in maintaining its wastewater system and identifying deficiencies before they require larger and more costly repairs.
In 2025, the City contracted with Lovett Services to seal 10 sewer manholes within the upper wastewater system. Through this project, Public Works staff demonstrated that the same work could be completed in-house using a fraction of the funds originally appropriated for the capital project. This approach allows the City to address additional work needed on certain manholes and make better use of available resources.
Work includes:
- Sealing manholes to reduce inflow and infiltration (I&I).
- Identifying and correcting deficiencies associated with sewer manholes.
- Documenting manhole conditions, sizes, and depths for the City’s new asset management system.
- Prioritizing manholes requiring larger repairs and developing future project needs and budgets.
- Monitoring wastewater flow data to better understand the amount of I&I entering the system.
Project Details
General work hours: 7 a.m. to 6 p.m., Monday through Friday
Location: Citywide, with initial work focused in the upper village
Start date: Summer 2025
Anticipated completion date: June 2027
Impacts
Inflow and infiltration occurs when stormwater or groundwater enters the wastewater collection system through sources such as damaged infrastructure, defective manholes, or other deficiencies. Reducing unnecessary water entering the system can improve wastewater system capacity and reduce the amount of water that must be treated.
The initial manhole rehabilitation work is expected to be completed by June 2027. Following completion, the City will monitor wastewater flow data through 2028 to develop a better understanding of the amount of I&I affecting the system and establish a baseline for future improvements.
Reducing I&I is anticipated to improve system efficiency and may reduce wastewater treatment costs paid to the City of Gresham, where the City of Wood Village contracts for wastewater treatment.
Projects in Planning
The City of Wood Village is planning accessibility and ballfield improvements at Donald L. Robertson Park to enhance safety, accessibility, and recreational opportunities for community members.
Work includes:
- Construction of a safer, ADA-accessible crossing between the splash pad and restroom building.
- Improvements to address existing accessibility challenges associated with the current crossing location.
- Replacement of worn ballfield infield soil with appropriate athletic field materials.
- Improvements designed to enhance field safety, playability, and long-term maintenance.
Project Details
General work hours: To be determined during final design and construction planning
Location: Donald L. Robertson Park, 24300 NE Halsey St
Start date: ADA crossing design anticipated in Fall 2026; ballfield improvements anticipated later in 2026.
Anticipated completion date: ADA crossing construction anticipated in Spring 2027
Impacts
During construction, park visitors may experience:
- Temporary closures or restrictions in active work areas.
- Construction equipment and crews operating within the park.
- Temporary impacts to access routes near the splash pad, restroom area, and ballfield.
- Short-term disruptions associated with construction activities.
Project schedules and impacts will be communicated as construction timelines are finalized. The City will work to minimize disruptions while delivering these important park improvements.
The City of Wood Village is planning a new wetland park on approximately 4.5 acres at the southeast corner of Wood Village Boulevard and Arata Road. The project will restore and enhance the site’s natural wetland functions while creating new recreational and educational opportunities for the community.
Work includes:
- Wetland restoration and habitat enhancement.
- Construction of an elevated boardwalk and pathway system.
- Protection and preservation of existing native vegetation.
- Native plant installation and restoration in partnership with the Confederated Tribes of Grand Ronde and Wisdom of the Elders.
- Environmental, geotechnical, and structural improvements necessary to meet state and federal permitting requirements.
- Creation of accessible public open space within a protected wetland environment.
Project Details
General work hours: To be determined during final design and construction
Location: Southeast corner of Arata Rd and Wood Village Blvd
Start date: Project planning and permitting are currently underway
Anticipated completion date: Restoration planting anticipated Fall 2027
Impacts
During project development and future construction, community members may experience:
- Environmental review and permitting activities on and around the project site.
- Temporary construction-related activity during park development.
- Construction equipment and contractors working within the project area.
- Limited site access during active construction phases.
The City of Wood Village is planning a new booster pump station at Reservoir #1 to improve the reliability, redundancy, and resilience of the municipal water system. The project will transfer water from the Lower Pressure Zone (LPZ) to the Upper Pressure Zone (UPZ), helping address existing system deficiencies, improve operational flexibility, and ensure continued delivery of safe and reliable water service to the community.
Project Details
General work hours: To be determined during final design and construction
Location: Southwest of NE 238th Dr and east of NE 239th Pl
Start date: Project planning currently underway
Anticipated completion date: TBD
Impacts
During future construction, community members may experience:
- Temporary traffic control measures near the project site.
- Construction equipment, contractors, and utility crews working within the project area.
- Noise associated with construction activities during approved work hours.
- Temporary impacts to nearby properties, access routes, or utility infrastructure as work is completed.
Completed Projects
The projects listed below highlight major capital improvements completed by the City of Wood Village in recent years, including projects identified through City master plans, infrastructure assessments, and long-range planning efforts. While this list represents some of the City’s most significant investments, it is only a snapshot of the many improvements completed to enhance public infrastructure, parks, transportation facilities, utilities, accessibility, and community spaces.
| Project | Year |
|---|---|
| Wood Village Community Garden Expansion | 2026 |
| CDBG Park Enhancements at Donald L. Robertson Park | 2025 |
| New Park Restroom Facilities at Donald L. Robertson Park | 2025 |
| RRFB Pedestrian Crosswalk at Wood Village Blvd & Riverwood St | 2025 |
| Wood Village Community Garden | 2025 |
| New Gateway and Electronic Message Center (EMC) Signage | 2024 |
| Shea Lift Station Updates | 2024 |
| CDBG Ballfield Enhancements at Donald L. Robertson Park | 2023 |
| CDBG Picnic Enhancements at Donald L. Robertson Park | 2023 |
| RRFB Pedestrian Crosswalks along NE Halsey St | 2023 |
| Full CCTV of City Sewer Lines | 2023 |
| Construction of New City Hall & Civic Center | 2021 |
| CDBG Irrigation Enhancements at Donald L. Robertson Park | 2018 |
| Cottonwood Water Pressure Enhancement | 2018 |
| Full Cleaning & Inspection of City Sewer Lines | 2017 |
| Stanley St & Holt Ct Rebuild | 2017 |
| Wood Village Green Waterline Extension & Fire Hydrants | 2017 |
| Halsey Sewer Line Upgrade | 2016 |